1 00:00:15,589 --> 00:00:11,749 [Music] 2 00:00:17,750 --> 00:00:15,599 2014 is off to an amazing start as nasa 3 00:00:22,070 --> 00:00:17,760 rockets towards this year's launch of 4 00:00:27,429 --> 00:00:24,550 the orion program began the year with 5 00:00:29,189 --> 00:00:27,439 several major milestones 6 00:00:31,509 --> 00:00:29,199 the service module was completely 7 00:00:33,270 --> 00:00:31,519 finished in january at kennedy space 8 00:00:34,950 --> 00:00:33,280 center in florida 9 00:00:37,190 --> 00:00:34,960 the service module is the part of the 10 00:00:39,750 --> 00:00:37,200 spacecraft that contains all of the 11 00:00:41,830 --> 00:00:39,760 structural elements spacecraft adapter 12 00:00:44,950 --> 00:00:41,840 payload fairings and crew module 13 00:00:47,270 --> 00:00:44,960 separation systems the eft-1 capsule 14 00:00:50,869 --> 00:00:47,280 needs to conduct its high-altitude 15 00:00:56,470 --> 00:00:53,590 in february the completed service module 16 00:00:58,389 --> 00:00:56,480 was stress tested for the final time 17 00:01:00,709 --> 00:00:58,399 the structural loads test proved that 18 00:01:03,590 --> 00:01:00,719 the vehicle will endure the physical 19 00:01:05,830 --> 00:01:03,600 stresses of its upcoming flight 20 00:01:09,830 --> 00:01:05,840 after the test the service module was 21 00:01:14,630 --> 00:01:12,149 a test of the forward bay cover and 22 00:01:17,190 --> 00:01:14,640 parachute system was successfully passed 23 00:01:18,710 --> 00:01:17,200 in january at the yuma proving ground in 24 00:01:21,030 --> 00:01:18,720 arizona 25 00:01:23,830 --> 00:01:21,040 after the orion mock-up was dropped from 26 00:01:26,149 --> 00:01:23,840 a plane the forward bay cover separated 27 00:01:28,789 --> 00:01:26,159 from the capsule allowing the parachutes 28 00:01:32,390 --> 00:01:28,799 to release as the crew module descended 29 00:01:37,109 --> 00:01:34,710 the capsule parachutes and forward bay 30 00:01:38,950 --> 00:01:37,119 cover were recovered and subjected to 31 00:01:40,550 --> 00:01:38,960 additional testing in the following 32 00:01:43,190 --> 00:01:40,560 months 33 00:01:45,429 --> 00:01:43,200 in february the delta mariner delivered 34 00:01:48,230 --> 00:01:45,439 two of the core and starboard boosters 35 00:01:50,389 --> 00:01:48,240 for the delta iv heavy rocket 36 00:01:52,469 --> 00:01:50,399 after the boosters go through stringent 37 00:01:54,950 --> 00:01:52,479 testing and processing in the horizontal 38 00:01:58,069 --> 00:01:54,960 integration facility they will roll out 39 00:02:00,550 --> 00:01:58,079 to launch complex 37 for eft ones 40 00:02:02,550 --> 00:02:00,560 launched later this year 41 00:02:04,389 --> 00:02:02,560 a full-scale mock-up of the orion 42 00:02:06,870 --> 00:02:04,399 capsule was delivered to langley 43 00:02:08,790 --> 00:02:06,880 research center in march 44 00:02:11,750 --> 00:02:08,800 the mock-up will be used to perform a 45 00:02:14,630 --> 00:02:11,760 variety of static and impact tests to 46 00:02:19,140 --> 00:02:14,640 evaluate various water landing scenarios 47 00:02:22,470 --> 00:02:19,150 in a wide array of different conditions 48 00:02:24,390 --> 00:02:22,480 [Music] 49 00:02:27,030 --> 00:02:24,400 at nasa's kennedy space center in 50 00:02:29,190 --> 00:02:27,040 florida upgrades and modernization of 51 00:02:31,670 --> 00:02:29,200 the multi-payload processing facility 52 00:02:33,990 --> 00:02:31,680 continue as the building is readied for 53 00:02:37,350 --> 00:02:34,000 orion processing support 54 00:02:39,350 --> 00:02:37,360 by april of next year the mppf will have 55 00:02:41,750 --> 00:02:39,360 updated structural elements like 56 00:02:45,350 --> 00:02:41,760 environmental control systems high bay 57 00:02:47,270 --> 00:02:45,360 doors and emergency systems 58 00:02:49,830 --> 00:02:47,280 the facility is also upgrading 59 00:02:52,470 --> 00:02:49,840 spacecraft preparation elements such as 60 00:02:54,710 --> 00:02:52,480 fuel and breathable gas systems time 61 00:02:58,309 --> 00:02:54,720 critical installation equipment and 62 00:03:01,110 --> 00:02:58,319 ground support equipment storage 63 00:03:03,589 --> 00:03:01,120 in january the crawler transporter 2 64 00:03:05,430 --> 00:03:03,599 completed a test drive on new traction 65 00:03:07,509 --> 00:03:05,440 roller bearings in two of its truck 66 00:03:09,270 --> 00:03:07,519 sections 67 00:03:10,869 --> 00:03:09,280 the new roller bearings are one of 68 00:03:12,630 --> 00:03:10,879 several upgrades to the crawler 69 00:03:14,790 --> 00:03:12,640 transporter which will carry the 70 00:03:18,630 --> 00:03:14,800 significantly heavier space launch 71 00:03:20,550 --> 00:03:18,640 system out to launch pad 39b 72 00:03:22,869 --> 00:03:20,560 the other two truck sections of the 73 00:03:24,949 --> 00:03:22,879 crawler transporter will also receive 74 00:03:28,149 --> 00:03:24,959 new roller bearings and complete a 75 00:03:30,869 --> 00:03:28,159 follow-up test drive in november 76 00:03:33,190 --> 00:03:30,879 in february nasa and the navy tested 77 00:03:35,110 --> 00:03:33,200 procedures to be used during orion 78 00:03:37,990 --> 00:03:35,120 recovery operations 79 00:03:40,070 --> 00:03:38,000 after launch and re-entry simulations 80 00:03:42,229 --> 00:03:40,080 the forward bay cover and parachutes 81 00:03:45,350 --> 00:03:42,239 were successfully retrieved from rough 82 00:03:47,589 --> 00:03:45,360 waters off the california coast 83 00:03:49,910 --> 00:03:47,599 the ocean turbulence in the well deck of 84 00:03:53,110 --> 00:03:49,920 the recovery ship made it difficult to 85 00:03:55,350 --> 00:03:53,120 secure the orion test article 86 00:03:57,910 --> 00:03:55,360 the challenges experienced during this 87 00:04:05,350 --> 00:03:57,920 test reinforced the necessity of 88 00:04:09,750 --> 00:04:07,509 the circumferential dome weld tool 89 00:04:12,149 --> 00:04:09,760 produced a second liquid oxygen tank 90 00:04:13,589 --> 00:04:12,159 confidence article at the machu assembly 91 00:04:15,589 --> 00:04:13,599 facility 92 00:04:17,749 --> 00:04:15,599 the confidence tank verified that the 93 00:04:20,229 --> 00:04:17,759 weld tool is capable of producing the 94 00:04:22,230 --> 00:04:20,239 core stage tank up to the exacting 95 00:04:24,550 --> 00:04:22,240 standards the space launch system will 96 00:04:27,030 --> 00:04:24,560 require 97 00:04:29,030 --> 00:04:27,040 a composite cryotank for liquid hydrogen 98 00:04:31,110 --> 00:04:29,040 was also produced and delivered to 99 00:04:35,590 --> 00:04:31,120 marshall space flight center aboard 100 00:04:37,909 --> 00:04:35,600 nasa's super guppy cargo plane in march 101 00:04:40,310 --> 00:04:37,919 the advanced composite cryo tank which 102 00:04:42,950 --> 00:04:40,320 could benefit many of nasa's deep space 103 00:04:45,110 --> 00:04:42,960 exploration spacecraft will undergo a 104 00:04:47,189 --> 00:04:45,120 series of structural pressure tests 105 00:04:49,830 --> 00:04:47,199 later this year 106 00:04:52,150 --> 00:04:49,840 a scale model of the sls was used in 107 00:04:55,030 --> 00:04:52,160 acoustic testing to see what effects 108 00:04:57,510 --> 00:04:55,040 high and low frequency sound waves will 109 00:04:59,990 --> 00:04:57,520 have during launch 110 00:05:02,070 --> 00:05:00,000 the model's core stage fired for five 111 00:05:04,790 --> 00:05:02,080 seconds while an array of microphones 112 00:05:06,710 --> 00:05:04,800 collected the acoustic data 113 00:05:08,870 --> 00:05:06,720 a full assembly test with the scale 114 00:05:12,629 --> 00:05:08,880 rocket motors will be conducted later 115 00:05:17,189 --> 00:05:15,029 in march nasa administrator charles 116 00:05:19,430 --> 00:05:17,199 bolden visited marshall after the 117 00:05:22,150 --> 00:05:19,440 software integration team powered up the 118 00:05:25,029 --> 00:05:22,160 flight avionics which includes hardware 119 00:05:27,270 --> 00:05:25,039 software and operating systems for space 120 00:05:29,430 --> 00:05:27,280 launch system 121 00:05:31,990 --> 00:05:29,440 known as first light the flight 122 00:05:34,150 --> 00:05:32,000 computers of the sls simulated the 123 00:05:38,070 --> 00:05:34,160 flight path the vehicle will experience 124 00:05:43,110 --> 00:05:40,469 nasa's exploration systems development 125 00:05:47,110 --> 00:05:43,120 division is flying through production 126 00:05:49,029 --> 00:05:47,120 testing and launch as 2014 promises to